Home
This DXped is still in the planning stages, possibly will be moved to March 2013.
Focus on :
Maximum number of different stations contacted
CW, some SSB and RTTY when things slow down
EU when possible
15 meters anticipated prime band
160 m
Location south of the Pago Pago harbor area to avoid mountain low angle cut off as possible
Equipment
2X Elecraft K3
Elecraft PA 500w
160 Inv L
Spiderbeam with 10 meter mast
80/40 via TBD
QSLs
LOTW
bureau or direct via TBD